docs: close workflow phase one
This commit is contained in:
1 parent
dd69b30b84
commit
8446965d88
2 files changed
+23
-21
No files matched your search
@@ -1,7 +1,8 @@
|
||||
# Workflow system blueprint
|
||||
|
||||
Status: declarative core implemented; pilots remain. Current gates and the
|
||||
operational handoff live in [`plans/workflow-system.md`](plans/workflow-system.md).
|
||||
Status: phase one implemented and active; explicitly deferred pilots remain.
|
||||
The operational handoff lives in
|
||||
[`plans/workflow-system.md`](plans/workflow-system.md).
|
||||
|
||||
This document is the durable design for the workstation and surrounding Yookr
|
||||
workflow. Implementation history belongs in Git.
|
||||
@@ -160,12 +161,11 @@ generalize the exception to other repositories.
|
||||
Only the user activates a NixOS or Home Manager generation. Agents may evaluate
|
||||
and build configurations, then provide an activation command.
|
||||
|
||||
## Remaining pilots
|
||||
## Phase-one closure
|
||||
|
||||
- Run one real cross-system investigation. The workbench environment, all four
|
||||
SOPS-derived Dadbod connections, read-only example-query runs, and Kulala
|
||||
response chaining have passed. Add a Marimo report only when the investigation
|
||||
gives it durable value.
|
||||
- The workbench environment, all four SOPS-derived Dadbod connections, read-only
|
||||
example-query runs, and Kulala response chaining passed. The cross-system
|
||||
investigation and Marimo report pilots move into phase two.
|
||||
- Add another ephemeral read-only rclone remote only when credentials for a new
|
||||
Leafcloud project become available. Irristaud listing has passed; do not upload.
|
||||
- Use the reviewed local Yookr OpenAPI contract while the accepted malformed
|
||||
@@ -176,11 +176,12 @@ and build configurations, then provide an activation command.
|
||||
states, local branches, parallel non-overlapping plans, and the dirty-removal
|
||||
guard passed; the plans show that implementation belongs outside the dashboard
|
||||
repository.
|
||||
- Keep Bruno, DBeaver, and existing PIM clients until their independent gates are
|
||||
resolved.
|
||||
- Keep Bruno and DBeaver; retiring old applications is outside phase one.
|
||||
|
||||
## Deferred pilots
|
||||
|
||||
Revisit these alongside related phase-two ideas rather than as isolated cleanup.
|
||||
|
||||
- Capture Zenith's external display identity during a docked session and test the
|
||||
two-output `Super+A` exchange, including name and focus restoration on failure.
|
||||
- Resume Evolution and Android PIM only when the user chooses to run those daily
|
||||
|
||||
Reference in new issue
Block a user