Record the reported navigation and coordination friction, verified native capabilities, and provisional workflow comparison. Keep proposed delegation and tool choices distinct from accepted decisions; collect workload, persistence and trial constraints together.
Condense the working handoff into implemented state, activation evidence and open choices. Record both repositories, flag superseded SharePoint setup instructions and undocumented input/support changes, and align the design with completed workbench organization.
Keep the generated nvim.log locally but ignore it. Both flakes evaluated successfully and whitespace checks passed. No implementation behavior changes, tests, builds, activation or remote writes.
Preserve the accumulated phase-two record and introduce the constellation design and working agreement. Archived approvals and plans are historical, not current authority.