Commit Graph
13 Commits
Author SHA1 Message Date
kiri 7cbae3d221 docs: accept Herdr bindings and keep Niri workspaces flexible 2026-09-09 21:07:04 +02:00
kiri a2486c93c5 docs: record Bluetooth hang findings and resume workspace planning 2026-09-09 21:04:28 +02:00
kiri e61f230978 feat: add hold-to-talk listener and restore Handy-managed preferences 2026-09-09 20:44:59 +02:00
kiri 0992f3b863 feat: manage Handy preferences and startup declaratively 2026-09-09 20:39:08 +02:00
kiri 345ef7c56c fix: enable native Wayland dictation paste with wtype 2026-09-09 20:27:23 +02:00
kiri 899ab7095b fix: suppress microphone activity indications and document dictation diagnosis 2026-09-09 20:21:53 +02:00
kiri 786fc97ea0 feat: add local dictation with Handy and Niri shortcuts 2026-09-09 20:08:46 +02:00
kiri 4949aef927 fix: keep SharePoint sync from blocking Home Manager activation
Preserve an in-flight timer job during service switching instead of restarting the oneshot and waiting for a potentially long synchronization. Herdr config installation succeeds; the activation timeout occurs later in reloadSystemd.

Verified the native keep-old behavior in pinned sources and a focused sd-switch dry run. Formatting, flake evaluation, Zenith build and whitespace checks passed. No live services changed; full activation remains user-controlled.
2026-09-09 18:33:52 +02:00
kiri a85cb5a928 feat: align Herdr keyboard navigation with the desktop
Add direct Ctrl+Alt pane, workspace, picker and agent navigation while retaining prefix shortcuts. Manage the existing theme and sidebar preferences with the keymap in Home Manager. Record Herdr as the chosen manager and defer agent evaluation.

Formatting, rendered TOML parsing, flake evaluation, Zenith system build and whitespace checks passed. User activation and interactive keyboard acceptance remain; no live sessions were changed.
2026-09-09 18:10:48 +02:00
kiri 7514ceb04f docs: frame project and agent workflow exploration
Record the reported navigation and coordination friction, verified native capabilities, and provisional workflow comparison. Keep proposed delegation and tool choices distinct from accepted decisions; collect workload, persistence and trial constraints together.
2026-09-09 17:50:50 +02:00
kiri c8cbc90d87 docs: clarify autonomous progress and batched input stops 2026-09-09 17:39:00 +02:00
kiri 8342efd8df docs: establish the constellation Git baseline
Condense the working handoff into implemented state, activation evidence and open choices. Record both repositories, flag superseded SharePoint setup instructions and undocumented input/support changes, and align the design with completed workbench organization.

Keep the generated nvim.log locally but ignore it. Both flakes evaluated successfully and whitespace checks passed. No implementation behavior changes, tests, builds, activation or remote writes.
2026-09-09 17:34:51 +02:00
kiri 4e3a3ac899 docs: archive workflow plans and introduce constellation
Preserve the accumulated phase-two record and introduce the constellation design and working agreement. Archived approvals and plans are historical, not current authority.
2026-09-09 17:31:03 +02:00